Testimonials

What People are saying …

InSync utilization of proven artificial intelligence technology
that learns and adjusts instantaneously to changes in
varying traffic conditions will redefine how traffic signals
are operated.

Thomas Ryan, P.E.
HDR, Inc.; Retired Assistant District EngineerMissouri DOT 

The solution is so simple and pragmatic. I wish I had thought of this first.

Steve Beck, P.E.Public Works DirectorCity of Little Rock, Arkansas
 

The competence and responsiveness of the support staff has demonstrated the company’s willingness to continue assisting us while we improve the overall safety and efficiency of this system. We are looking forward to making more installations in the future and seeing the improvements that will follow. What a breath of fresh air!

Glen BollingerTraffic EngineerColumbia County, Georgia 

InSync has provided us with a continuously coordinated signal system using almost no staff time. We have been very pleased with the results and are looking forward to implementing the system in our second corridor.

Steve Schooley, P.E.Transportation ManagerCity of Lenexa, Kansas

 

I’ve lived in Lenoir Woods for 9 years, and I drive Grindstone Parkway from New Haven Road to Providence several times a week. Yesterday a minor miracle occurred. I drove that distance without having to stop for a red light. That contrasts with the thousands of times that I have stopped at each light, or more than 50 percent of them. When I multiply my past frustrations, time and gasoline times the number of cars that drive that stretch daily, it amounts to an amazing number of hours and dollars. Thank you, thank you to whomever made the changes. Please do not change it back.

Citizen of Columbia, MissouriLetters to the EditorThe Columbia Daily Tribune 

InSync provides seamless operations between intersections with minimum delays and drive times. No engineering staff time is necessary to address changing traffic patterns in this growing section of Little Rock. We are extremely pleased with the system.

William Henry, P.E.
Transportation ManagerCity of Little Rock, Arkansas 

It was amazing to see the transformation in the road in mere minutes after the system was turned on.

Matt Schlachter, P.E.DirectorColumbia County Board of Commissioners 

I drove the 291 Corridor (12 signals, 2.53 miles) within hours after hardware installation and had one thought: IMPRESSIVE!”

Thomas Evans, P.E.District Traffic EngineerMissouri Department of Transportation